Products | Drive Technology | Linear Actuators | Hydraulic Steel works | ADE-WERK GmbH
» Inquiry
ADE-WERK GmbH
Englerstraße 9
77652 Offenburg
Germany

Phone: +49 781 209-0
Fax: +49 781 209-99
E-Mail: info@ade.de


Hydraulic steel works

  • Up to 1.600 kN

ADE-WERK has been producing spindle-driven linear electric actuators in special, customised applications, mainly for the multiple industrial use, since approx. 1965. The extensive experiences in this field of drive technology were the basis for the groundbreaking success of the ADE linear electric actuators as the drive concept for navigation locks and barrages since their first installation in 1995.
 

ADE-Actuator, weir of Liepe (Germany)

(photo WSA Eberswalde)



Compared to the previously used outdated electromechanical drives and the electro-hydraulic drives installed since the 1980s, which are hazardous to the environment, these linear electric actuators, which were specially conceived for this application and which have in the mean time become standardised, have prevailed. ADE’s linear electric actuators have proven themselves repeatedly and become indispensable due to their quick and uncomplicated commissioning procedure and minimal error-rate, even under very tough and challenging operating conditions.

The previously used, conventional electromechanical drive, which consisted mostly of open reduction stages, swivelling segments, and driving rods, was not only problematic with regard to environmental pollution but also required a lot of maintenance - due to its open grease lubrication. In case of an electric oil-hydraulic drive, leakages can never be excluded and pose a considerable potential danger. Oil and tube change intervals, as well as regular leakage checks, increase the amount of maintenance required.
 

ADE-Actuator for sluice gate, navigation lock of Evergem - Ringvaart Gent (Belgium)



In this way, the further development to the currently used ADE linear electric actuator, with all of its known advantages, became a necessary and logical consequence.The ADE linear electric actuator, as a completely encapsulated, electro-mechanical drive unit, consists basically of a drive motor, screw drive with bearing, housing and the extendable and retractable piston rod as the external power transmission element.

Its essential advantages compared with the previous, conventional drive variants along the waterway, are documented by numerous references in the area of hydraulic steel structures. In the mean time, 900 drives of this kind have been delivered and are used all over Europe in over 150 sluices and weir systems.


Basic design and function: ADE linear electric actuators for hydraulic steel structures

 

Item 1   Motor / Gearbox
Induces torque at screw drive. Depending on the direction of rotation, it causes the actuator to travel forwards or backwards.

Item 2  Spring assembly
Integrated spring assembly, protects actuator against operational axial impact loads.

Item 3  Bearing

Item 4  Screw drive /piston
The screw drive causes the actual move.and generates axial force at torque.

Item 5  Housing
Its task is a general protection against external influences. The housing is used for guiding the piston.

Item 6  Piston rod
The piston is connected to the piston rod, which itself moves inwards and outwards.

Item 7  Guiding of piston rod
Its task is to guide the piston rod and at the same time it is a sealing element, also protecting against dirt and aggressive medium.

Item 8  Swivel- / fork head
Trough the pivot head / fork head, the power is fed to the part to be moved.
 
 

Types of spindles:

The following spindles are used at ADE, depending on the request:
 
Acme thread screw   Recirculating ball screw   Planetary roller screw
   
         
         
         

Comparison of the advantages and disadvantages as well as the constructive features of the different spindle drives
 
Linear actuator
with

acme thread screw
Linear actuator
with
recirculating ball screw
Linear actuator
with planetary roller screw
Spindle Rolled precision acme screw Rolled / smoothed threaded spindle Smoothed threaded spindle
Screw nut Bronce screw nut Smoothed ball screw-nut Planetary roller screw-nut
Self-locking effect yes no no
Robustness very high high very high
Shock sensitivity very low medium very low
Speed range medium high very high
Stick-Slip effect present not present not present
Carrying capacity high medium very high
Sensitifity to icing yes no no
Wear yes no no
Positioning
precision
dependent on duration of operation nearly consistent nearly consistent
Degree of efficiency low very high high
Lifespan medium high very high
Reliability medium high very high
 

 

Sample applications

 
Please select a category to see the corresponding sample applications:
 
   
Navigation locks   Weir systems   other



Sample applications for navigation locks

Navigation lock Beeskow
 
     
 


Riensluis Lemmer (NL)
 
     
 


Installation works or navigation lock Wusterwitz
 


Lift gate navigation lock Baldenaysee
 
     
   


Navigation lock Bolzum
 
     
   


Navigation lock of Evergem - Ringvaart Gent (Belgium) - ADE-Actuator for sluice gate for head gate, middle gate and lower gate
 
     
 


Neckar navigation lock
 
     
   


New construction of 2. navigation lock of Kersdorf (Germany)
 
     
   


Juliana navigation lock (NL)
 


Installation works navigation lock Sülfeld
 


Top of page



Sample applications for weir systems

Weir system Malchow
 
     
   
  

Weir system Liepe
 
         
       


Weir system Lewitz
 
         
       


Weir system Dömitz
 
  


Weir system Rathenow
 
         
       


Weir system Güritz
 


Weir system Quimperlé (F)
 


Weir system Barrage des Lorraines (F)
 
         
       


Top of page


Sample applications "Other"


Flood control reservoir of Hoftal (Germany)
 
     
   


Victoriebrug Alkmaar (NL)
 
     
   


Hogebrug Vianen
 
     


Inlet channel - hydropower plant of Jettenbach (Germany)
 
     
   


Bridge Potshausen
 
     
   


Bridge Banzkow
 


Impact protection device – navigation lock of Hamm (Germany)
 


Impact protection device – navigation lock of Hesselte (Germany)
 


Top of page
 

OVERVIEW OF NAVIGAGTION LOCK AND WEIR SYSTEM DRIVES
with ADE electrical lifting cylinders

Status January 2016


- Lübz lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 2 mitred gate drives, aft gate 30kN/1530mm
 2 slide gate drives, aft gate 10kN/820mm
 2 bell sluice drives for head gate 10kN/500mm
 Delivery March 1996
 Implementation May 1996

- Rathenow City lock lockage (Havel, Brandenburg)
 1 segment gate drive, aft gate 23kN/300mm
 Delivery May 1996
 Implementation July 1996

- Bad Cannstatt lockage (Neckar, Baden-Wuerttemberg)
 1 compound drive 100kN/2950mm
 Delivery August 1996
 Implementation September 1996

- Hofen lockage (Neckar, Baden-Wuerttemberg)
 1 compound drive 100kN/2950mm
 Delivery August 1996
 Implementation September 1996

- Horkheim lockage (Neckar, Baden-Wuerttemberg)
 1 compound drive 100kN/2950mm
 Delivery August 1996
 Implementation September 1996

- Hirschhorn lockage (Neckar, Hesse)
 Head gate / left chamber
 2 mitred gate drives 300kN/1800mm
 2 segment gate drives 140kN/420mm
 Delivery May 1997
 Implementation June 1997

- Rathenow City lock lockage (Havel, Brandenburg)
 Head gate / aft gate
 4 mitred gate drives 45kN/2000mm
 4 segment gate drives 23kN/300mm
 Delivery April 1997
 Implementation May 1997

- Hamm-Werries lockage (Datteln-Hamm Canal, North Rhine Westphalia)
 4 circulation sluice drives 120kN/2400mm
 Delivery October 1997
 Implementation December 1997

- Neu Kaliß lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 Head gate / aft gate
 4 mitred gate drives 30kN/1530mm
 4 roll wedge drives 10kN/800mm
 Delivery October 1997
 Implementation April 1998

- Dörverden lockage (Mittelweser, Lower Saxony)
 Aft gate
 4 roller sluice drives 100kN/1200mm
 Delivery October 1997
 Implementation December 1997

- Heilbronn lockage (Neckar, Baden-Wuerttemberg)
 both aft gates / left and right chambers
 4 mitred gate drives 300kN/1800mm
 4 segment gate drives 140kN/420mm
 1 compound drive 100kN/2950mm
 2 cable end locks 10kN/60mm
 Delivery April 1998
 Implementation July 1998

- Neue Mühle lockage (Dahme waterway, Brandenburg)
 Head gate / aft gate
 4 mitred gate drives 30kN/1800mm
 4 roll wedge drives 12kN/800mm
 Delivery February 1998
 Implementation April 1998

- Rosenbeck lockage (Werbellinkanal, Brandenburg)
 Head gate / aft gate
 4 mitred gate drives 30kN/1530mm
 4 roll wedge drives 10kN/850mm
 Delivery March 1998
 Implementation April 1998

- Dömitz weir system (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 2 drives 7m - fishbellied flap 330kN/3800mm
 1 drive 3m - fishbellied flap 180kN/4700mm
 1 cheek gate drive 35kN/1830mm
 1 cheek gate flood-control sluice drive 15kN/565mm
 2 fishway sluice drives 20kN/1300mm
 1 intake structure sluice drive 20kN/1300mm
 Delivery July 1998
 Implementation January 1999

- Dörpen lockage (Coastal canal, Lower Saxony)
 2 circulation sluice drives 45kN/1550mm
 2 drainage sluice drives 45kN/1550mm
 Delivery July 1998
 Implementation September 1998

- Güritz lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 Aft gate
 2 mitred gate drives 30kN/1530mm
 2 roll wedge drives 10kN/950mm
 Locking cylinder for lifting gate 10kN/30mm
 Delivery January 1999
 Implementation May 1999

- Woltersdorf lockage (Rüdersdorf waters / Berlin)
 Head gate / aft gate
 4 mitred gate drives 120kN/2000mm
 4 segment gate drives 30kN/450mm
 1 bascule bridge top bolt 10kN/250mm
 Delivery February 1999
 Implementation June 1999

- Dömitz barrage (Dove Elbe, Mecklenburg-Western Pomerania)
 Outlet structure
 4 mitred gate drives 30kN/1500mm
 Delivery June 1999
 Implementation October 1999

- Himmelpfort lockage (Lychen waters, Brandenburg)
 Head gate / aft gate
 4 mitred gate drives 30kN/1530mm
 4 slide gate drives 10kN/850mm
 Delivery March 1999
 Implementation April 1999

- Guttenbach lockage (Neckar, Baden-Wuerttemberg)
 Head gate, left chamber
 2 mitred gate drives 300kN/1800mm
 2 segment gate drives 140kN/420mm
 1 compound drive 100kN/2950mm
 2 cable end locks 10kN/60mm
 Delivery July 1999
 Implementation October 1999

- Griesheim small lock lockage (Main, Hesse)
 Head gate / aft gate
 2 cheek gate drives 54kN/1530mm
 2 slide gate drives 14kN/530mm
 Delivery August 1999
 Implementation August 2000

- Bannetze lockage (Aller, Lower Saxony)
 Upper head/lower head
 4 circulation sluice drives 40kN/1850mm
 Delivery November 1999
 Implementation January 2000

- Hessigheim lockage (Neckar, Baden-Wuerttemberg)
 1 compound drive 100kN/2950mm
 Delivery November 1999
 Implementation March 2000

- Neuburg lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 Aft gate / head gate
 2 mitred gate drives LH 30kN/1530mm
 2 slide gate drives LH 28kN/950mm
 2 slide gate drives UH 28kN/950mm
 1 flap gate drive UH 90kN/2400mm
 Delivery February 2000
 Implementation April 2000

- Plötzensee lockage (Berlin-Spandau shipping canal, Berlin)
 Aft gate / head gate, north chamber
 2 mitred gate drives LH 120kN/2000mm
 2 segment gate drives LH 35kN/1000mm
 2 segment gate drives UH 35kN/1000mm
 1 flap gate drive UH 150kN/5500mm
 Delivery June 2000
 Implementation August 2000

- Offenbach small lock lockage (Main, Hesse)
 Head gate
 1 flap gate drive 340kN/850mm
 Delivery May 2000
 Implementation December 2000

- Neukölln lockage (Neukölln Ship Canal / Berlin)
 Head gate / aft gate
 4 mitred gate drives 200kN/1520mm
 Delivery November 2000
 Implementation April 2001

- Rodde lockage (Dortmund-Ems canal / North Rhine Westphalia)
 Lower head
 2 abutment beam drives 55kN/1590mm
 Delivery November 2000
 Implementation February 2001

- Venhaus lockage (Dortmund-Ems canal / North Rhine Westphalia)
 Lower head
 2 abutment beam drives 55kN/1870mm
 Delivery November 2000
 Implementation February 2001

- Hesselte lockage (Dortmund-Ems Canal / North Rhine Westphalia)
 Lower head
 2 abutment beam drives 55kN/2160mm
 Delivery November 2000
 Implementation February 2001

- "Small lock Flaesheim" lockage (Wesel-Datteln Canal / North Rhine Westphalia)
 Lower head
 2 abutment beam drives 110kN/1500mm
 Delivery November 2000
 Implementation February 2001

- "Large lock Flaesheim" lockage (Wesel-Datteln Canal / North Rhine Westphalia)
 Lower head
 2 abutment beam drives 110kN/1500mm
 Delivery November 2000
 Implementation March 2001

- Neckarzimmern lockage (Neckar, Baden-Wuerttemberg)
 1 compound drive 100kN/2950mm
 Delivery December 2000
 Implementation February 2001

- Zaaren lockage (Upper Havel Waterway, Brandenburg)
 Head gate / aft gate
 4 mitred gate drives 30kN/1530mm
 4 slide gate drives 10kN/850mm
 Delivery January 2001
 Implementation April 2001

- Garwitz lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 Head gate / aft gate
 4 mitred gate drives 30kN/1530mm
 4 slide gate drives 28kN/950mm
 Delivery January 2001
 Implementation April 2001

- Hannover-Linden lockage (east side)
 1 roll wedge drive, lower head 200kN/2050mm
 1 circulation cylindrical sluice 100kN/1250mm
 1 saving basin cylindrical sluice 100kN/1250mm
 Delivery March 2001
 Implementation April 2001

- Büssau weir system (Elbe-LübeckCanal, Schleswig-Holstein)
 2 drives 6m - fishbellied flap 300kN/3450mm^
 Delivery August 2001
 Implementation December 2001

- South lock chamber of Fürstenwalde lockage (Oder-Spree Canal, Brandenburg)
 Upper head/lower head
 4 circulation sluice drives 50kN/1750mm
 Delivery May 2001
 Implementation June 2001

- Märkisch Buchholz weir system (Brandenburg)
 Flap drive 0.9m x 12m 290kN/1800mm
 Delivery October 2001
 Implementation February 2002

- Grütz lockage (Lower Havel / Brandenburg)
 Upper head / lower head
 4 mitred gate drives 80kN/2000mm
 4 circulation sluice drives 80kN/2000mm
 Delivery October 2001
 Implementation November 2001

- Hannover-Linden lockage (west side)
 1 roll wedge drive, lower head 200kN/2050mm
 1 circulation cylindrical sluice 100kN/1250mm
 1 saving basin cylindrical sluice 100kN/1250mm
 Delivery October 2001
 Implementation December 2001

- Schwedt lockage ("Schwedter Querfahrt" / Brandenburg
 Upper head / lower head
 4 mitred gate drives 110kN/2000mm
 4 flap gate drives 20kN/850mm
 Delivery November 2001
 Implementation December 2001

- Zehdenick lockage (Upper Havel Waterway, Brandenburg)
 Upper head / lower head
 4 mitred gate drives 110kN/2000mm
 Delivery November 2001
 Implementation March 2002

- Regow lockage (Upper Havel Waterway, Brandenburg)
 Head gate / aft gate
 4 mitred gate drives 30kN/1530mm
 4 slide gate drives 10kN/850mm
 Delivery November 2001
 Implementation March 2002

- Brunstatt lockage no. 36 (Canal du Rhone au Rhin, France)
 Aft gate / head gate
 4 mitred gate drives 20kN/1200mm
 3 slide gate drives LH 55kN/430mm
 2 circulation sluice drives UH 55kN/1230mm
 Delivery October 2001
 Implementation December 2001

- Heidwiller lockage no. 28 (Canal du Rhone au Rhin, France)
 Aft gate / head gate
 4 mitred gate drives 20kN/1200mm
 3 slide gate drives LH 55kN/430mm
 2 circulation sluice drives UH 55kN/1230mm
 Delivery October 2001
 Implementation June 2002

- Vladieu-Lutran lockage no. 2 north (Canal du Rhone au Rhin, France)
 Aft gate / head gate
 4 mitred gate drives 20kN/1200mm
 3 slide gate drives LH 55kN/430mm
 2 circulation sluice drives UH 55kN/1230mm
 Delivery December 2001
 Implementation April 2002

- Heidwiller lockage no. 29 (Canal du Rhone au Rhin, France)
 Aft gate / head gate
 4 mitred gate drives 20kN/1200mm
 3 slide gate drives LH 55kN/430mm
 2 circulation sluice drives UH 55kN/1230mm
 Delivery October 2001
 Implementation September 2002

- Barkow lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 Aft gate / head gate
 2 mitred gate drives LH 30kN/1530mm
 2 slide gate drives LH 28kN/950mm
 2 slide gate drives UH28kN/950mm
 1 flap gate drive UH90kN/2400mm
 Delivery February 2002
 Implementation April 2002

- Havelberg lockage (Lower Havel / Brandenburg)
 Upper head / lower head
 4 mitred gate drives 125kN/3000mm
 4 circulation sluice drives 125kN/3000mm
 Delivery March 2003
 Implementation July 2003

- Heidelberg lockage (Neckar, Baden-Wuerttemberg)
 Head gate / aft gate, left chamber
 4 mitred gate drives 300kN/1800mm
 4 segment gate drives 140kN/420mm
 Delivery May 2002
 Implementation April 2003

- Heidelberg lockage (Neckar, Baden-Wuerttemberg)
 Head gate / aft gate, right chamber
 4 mitred gate drives 300kN/1800mm
 4 segment gate drives 140kN/420mm
 Delivery March 2004
 Implementation May 2004

- Hagenbach lockage no. 23 (Canal du Rhone au Rhin, France)
 Aft gate / head gate
 4 mitred gate drives 20kN/1200mm
 2 flap gate drives LH 2000Nm/90°
 2 circulation sluice drives UH 55kN/1230mm
 Delivery October 2002
 Implementation February 2003

- Eglingen lockage no. 24 (Canal du Rhone au Rhin, France)
 Aft gate / head gate
 4 mitred gate drives 20kN/1200mm
 3 slide gate drives LH  55kN/430mm
 2 circulation sluice drives UH 55kN/1230mm
 Delivery October 2002
 Implementation 2003

- Eglingen lockage no. 25 (Canal du Rhone au Rhin, France)
 Aft gate / head gate
 4 mitred gate drives 20kN/1200mm
 2 flap gate drives LH 2000Nm/90°
 2 circulation sluice drives UH 55kN/1230mm
 Delivery October 2002
 Implementation 2003

- Wolfswinkel weir system (Finow Canal, Brandenburg)
 1 drive, fishbellied flap 200kN/3475mm
 Delivery August 2002
 Implementation September 2002

- City mill Perleberg weir system (Brandenburg)
 1 drive, fishbellied flap 160kN/2110mm
 Delivery September 2002
 Implementation December 2002

- Schorfheide lockage (Upper Havel Waterway, Brandenburg)
 Head gate / aft gate
 4 mitred gate drives 30kN/1530mm
 4 slide gate drives 10kN/850mm
 Delivery November 2002
 Implementation March 2003

- Storkow lockage (Storkow waters, Brandenburg)
 Head gate / aft gate
 4 mitred gate drives 50kN/1530mm
 4 slide gate drives 20kN/920mm
 Delivery November 2002
 Implementation March 2003

- South lock chamber of Kersdorf lockage (Oder-Spree Canal, Brandenburg)
 Upper head
 2 cylindrical sluice drives 50kN/360mm
 Delivery December 2002
 Implementation February 2003

- Grabow lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 Aft gate / head gate
 4 mitred gate drives UH/LH 30kN/1530mm
 4 sluice gate drives UH/LH 28kN/950mm
 Delivery February 2003
 Implementation March 2003

- Prieros lockage (Dahme waterway, Brandenburg)
 Aft gate / head gate
 4 mitred gate drives UH/LH 15kN/1450mm
 4 sluice gate drives UH/LH 15kN/1450mm
 Delivery February 2003
 Implementation June 2003

- Neu Kaliß weir system (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 2 drives 4m - fishbellied flap 175kN/4100mm
 Delivery March 2003
 Implementation July 2003

- Storkow weir system (Storkow waters, Brandenburg)
 1 weir flap drive 120kN/2300mm
 Delivery May 2003
 Implementation July 2003

- Kummersdorf weir system (Storkow waters, Brandenburg)
 1 weir shutter drive 20kN/1130mm
 Delivery July 2003
 Implementation July 2003

- Lower lock Minden lockage (connection channel from south, Minden - Lower Saxony)
 2 mitred gate drives LH 120kN/3000mm
 2 cylindrical sluice drives LH 40kN/700mm
 4 cylindrical sluice drives UH 40kN/700mm
 1 flap gate drive UH 157kN/5500mm
 Delivery September 2003
 Implementation December 2003

- Neckarzimmern lockage (Neckar, Baden-Wuerttemberg)
 Head gate / left chamber
 2 mitred gate drives 300kN/1800mm
 2 segment gate drives 140kN/420mm
 Delivery November 2003
 Implementation June 2004

- Jettenbach barrage (Innkanal, Bavaria)
 Channel inlet
 5 x 2 coupled sluice drives 2 x 80kN/4575mm
 Delivery September 2003
 Implementation October 2003

- Illfurth lockage no. 33 (Canal du Rhone au Rhin, France)
 Aft gate / head gate
 4 mitred gate drives 20kN/1200mm
 3 slide gate drives LH  55kN/430mm
 2 circulation sluice drives UH 55kN/1230mm
 Delivery November 2003
 Implementation 2004

- Zillisheim lockage no. 34 (Canal du Rhone au Rhin, France)
 Aft gate / head gate
 4 mitred gate drives 20kN/1200mm
 2 flap gate drives LH 2000Nm/90°
 2 circulation sluice drives UH 55kN/1230mm
 Delivery November 2003
 Implementation 2004

- Zillisheim lockage no. 35 (Canal du Rhone au Rhin, France)
 Aft gate / head gate
 4 mitred gate drives 20kN/1200mm
 2 flap gate drives LH 2000Nm/90°
 2 circulation sluice drives UH 55kN/1230mm
 Delivery November 2003
 Implementation 2004

- Stecher weir system (Finow Canal, Brandenburg)
 Drive, fishbellied flap 340kN/3770mm
 Delivery February 2004
 Implementation June 2004

- Liepe weir system (Finow Canal, Brandenburg)
 Drive, fishbellied flap 340kN/3770mm
 Delivery February 2004
 Implementation June 2004

- Lower Ucker lake weir system (Brandenburg)
 Drive, fishbellied flap  140kN/2110mm
 Delivery December 2003
 Implementation August 2004

- Berlin "Unterschleuse" lockage (Landwehr Canal, Berlin)
 Head gate / aft gate
 4 mitred gate drives 80kN/1610mm
 8 slide gate drives 22kN/890mm
 Delivery February 2004
 Implementation April 2004

- Horkheim lockage (Neckar, Baden-Wuerttemberg)
 Head gate / left and right chambers
 2 hook gate drives 120kN/7200mm
 Delivery August 2004
 Implementation September 2004

- Neustadt-Glewe lockage (Müritz-Elde-Waterway, Mecklenburg-Western Pomerania)
 Aft gate / head gate
 4 mitred gate drives UH/LH 30kN/1530mm
 4 sluice gate drives UH/LH 28kN/950mm
 Delivery February 2004
 Implementation April 2004

- Krummesse lockage (Elbe-LübeckCanal, Schleswig-Holstein)
 Aft gate
 2 mitred gate drives 80kN/2000mm
 Delivery February 2004
 Implementation March 2004

- Kleine Spree Niedergurig weir system (Brandenburg)
 Drive, fishbellied flap 120kN/2100mm
 Delivery May 2004
 Implementation May 2004

- Eldena weir system (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 2 drives, fishbellied flaps 425kN/4645mm
 Delivery June 2004
 Implementation August 2004

- Hannover-Linden lockage
 1 flap gate drive, upper head 140kN/6050mm
 Delivery May 2004
 Implementation June 2004

- Lockage in Hamm - Werries (Datteln-Hamm-Canal, North Rhine Westphalia)
 6 mitred gate drives UH/LH 190kN/2400mm
 Delivery September 2004
 Implementation October 2004

- Hamm lockage (Datteln-Hamm Canal, North Rhine Westphalia)
 5 mitred gate drives UH/LH  110kN/2300mm
 2 slide gate drives LH 60kN/2000mm
 2 cylindrical sluice drives UH 100kN/800mm
 2 abutment beam drives LH 100kN/3450mm
 4 abutment beam locking cylinders 8kN/190mm
 Delivery September 2004
 Implementation October 2004

- Templin lockage (Upper Havel Waterway, Brandenburg)
 Head gate / aft gate
 4 mitred gate drives  30kN/1530mm
 4 slide gate drives 10kN/850mm
 Delivery October 2004
 Implementation September 2005

- Rathenow weir system (Brandenburg)
 4 drives, fishbellied flaps 800kN/3500mm
 Delivery March 2006
 Implementation June 2006

- Tiergartenschleuse Oranienburg weir system (Brandenburg)
 Drive, fishbellied flap 165kN/2200mm
 Delivery November 2004
 Implementation April 2005

- Hollage lockage (Osnabrück branch canal, Lower Saxony)
 4 sluice gate drives 40kN/700mm
 Delivery December 2004
 Implementation May 2005

- Haste lockage (Osnabrück branch canal, Lower Saxony)
 4 sluice gate drives 40kN/700mm
 Delivery December 2004
 Implementation May 2005

- Artern lockage (Unstrut, Thuringia)
 Head gate / aft gate
 4 mitred gate drives 15kN/1530mm
 4 slide gate drives 6kN/830mm
 Delivery February 2005
 Implementation June 2005

- Parchim lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 2 mitred gate drives LH 30kN/1530mm
 2 sluice gate drives LH 28kN/950mm
 Locking cylinder for lifting gate UH 10kN/30mm
 Delivery February 2005
 Implementation April 2005

- Sülfeld lockage (Mittelland Canal - Lower Saxony)
 5 mitred gate- (LH) / swivelling segment gate- (UH) drives 857kN/2150mm
 10 saving basin/axial canal lock drives 326kN/1905mm
 Delivery 2008
 Implementation November 2008

- Upper lock Minden lockage (connection channel from south, Minden - Lower Saxony)
 2 mitred gate drives LH 120kN/2100mm
 Delivery May 2005
 Implementation May 2005

- South Offenbach lockage (Main, Hesse)
 7 sluice drives LH/MH/UH 130kN/560mm
 Delivery June 2005
 Implementation starting May 2006

- Essen-Kettwig lockage (Ruhr, North Rhine Westphalia)
 Locking cylinder for lifting gate UH 4kN/130mm
 Delivery March 2005
 Implementation April 2005

- Münster lockage (Dortmund-Ems Canal / North Rhine Westphalia)
 2 circulation sluice drives LH 180kN/2560mm
 Delivery August 2005
 Implementation November 2005

- Hollage and Haste lockage (Osnabrück branch canal, Lower Saxony)
 5 sluice gate drives 40kN/700mm
 Delivery December 2005
 Implementation 2006

- Cospuden lockage (Cospudener See, Saxony)
 Head gate / aft gate
 2 cheek gate drives 25kN/1530mm
 2 slide gate drives 6kN/530mm
 Delivery December 2005
 Implementation July 2006

- Eichhorst lockage (Werbellin Canal, Brandenburg)
 Head gate / aft gate
 4 mitred gate drives 30kN/1530mm
 4 roll wedge drives 10kN/850mm
 Delivery 2006
 Implementation April 2006

- Wernsdorf lockage (Oder-Spree-Canal, Berlin)
 Aft gate / head gate, north chamber
 2 mitred gate drives LH 130kN/2000mm
 2 circulation sluice drives UH 80kN/1600mm
 1 flap gate drive UH 150kN/5500mm
 Delivery January 2006
 Implementation November 2006

- Lockages at the Canal des Houillères de la Sarre (France)
 Aft gate / head gate
 60 mitred gate drives 20kN/1200mm
 Delivery December 2005 to March 2007
 Implementation starting March 2006

- Rathenow main lockage (Lower Havel / Brandenburg)
 Upper head / lower head
 4 mitred gate drives 80kN/2000mm
 4 circulation sluice drives 80kN/2000mm
 Delivery February 2006
 Implementation May 2006

- Quimperlé weir system (l'Isole/Bretagne / France)
 1 weir flap drive 616kN/2200mm
 Delivery November 2005
 Implementation November 2005

- Hameln lockage (Weser / Lower Saxony)
 Upper head / middle head / lower head
 6 mitred gate drives 145kN/3100mm
 6 sluice drives 248kN/3100mm
 Delivery April 2006
 Implementation starting June 2006

- Meppen lockage (Dortmund-Ems Canal / North Rhine Westphalia)
 5 saving basin drives 90kN/2400mm
 1 tilting drive 75kN/400mm
 Delivery April 2006
 Implementation December 2006

- Lewitz weir system (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 2 drives, fishbellied flaps 425kN/4645mm
 Delivery March 2006
 Implementation August 2008

- Plau lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 Aft gate / head gate
 4 mitred gate drives UH/LH 30kN/1530mm
 4 sluice gate drives UH/LH 28kN/950mm
 Delivery February 2006
 Implementation April 2006

- Mulhouse lockage no. 41 (Canal du Rhone au Rhin, France)
 Head gate
 2 mitred gate drives 50kN/1300mm
 Delivery March 2006
 Implementation June 2006

- Möhnetalsperre Vordamm Heve
 2 sluice drives 80kN/1520mm
 Delivery October 2006
 Implementation 2007

- Ortrand weir system (Pulsnitz, Brandenburg)
 Drive, fishbellied flap 210kN/2800mm
 Delivery August 2006
 Implementation September 2006

- Varloh lockage (Dortmund-Ems Canal / North Rhine Westphalia)
 4 sluice drives 100kN/730mm
 2 abutment beam drives 110kN/2200mm
 4 abutment beam locking cylinders 8kN/190mm
 Delivery October 2006
 Implementation February 2007

- Bollingerfähr lockage (Dortmund-Ems Canal / North Rhine Westphalia)
 4 sluice drives 100kN/730mm
 2 abutment beam locking cylinders 8kN/190mm
 Delivery October 2007
 Implementation June 2007

- Bredereiche lockage (Havel Waterway, Brandenburg)
 Aft gate
 2 mitred gate drives 30kN/1530mm
 2 segment gate drives 20kN/800mm
 Delivery December 2006
 Implementation April 2007

- Liebenwalde lockage (Malz Canal, Brandenburg)
 Head gate / aft gate
 4 mitred gate drives 110kN/2000mm
 4 sluice drives 20kN/850mm
 Delivery December 2006
 Implementation April 2007

- Neckarsteinach lockage (Neckar, Baden-Wuerttemberg)
 Right chamber of upper head / lower head
 6 mitred gate drives 300kN/1800mm
 5 segment gate drives 140kN/420mm
 Delivery June 2007
 Implementation November 2007

- Hannover-Limmer lockage (Leine Abstiegsschleuse, Lower Saxony)
 8 sluice gate drives, lower/upper head 30kN/180mm
 4 mitred gate drives 195kN/4500mm
 Delivery February-March 2007
 Implementation April 2007

- Malliß lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 Aft gate / head gate
 4 mitred gate drives UH/LH 30kN/1530mm
 4 sluice gate drives UH/LH 28kN/950mm
 Delivery February 2007
 Implementation April 2007

- Heegermühle weir system (Finow Canal, Brandenburg)
 1 drive, fishbellied flap 340kN/3770mm
 Delivery November 2007
 Implementation April 2008

- Limburg lockage (Lahn, Hesse)
 Head gate / aft gate
 4 mitred gate drives 100kN/1550mm
 4 sluice drives 32kN/1050mm
 Delivery November 2007

- Diez lockage (Lahn, Rhineland-Palatinate)
 Head gate / aft gate
 4 mitred gate drives 100kN/1550mm
 4 sluice drives 32kN/1050mm
 Delivery November 2007

- Hademstorf lockage (Aller, Lower Saxony)
 4 sluice drives 40kN/1850mm
 Delivery April 2007
 Implementation April 2007

- Stiftsmühle lockage (Ruhr, North Rhine Westphalia)
 Flap gate drive UH 110kN/900mm
 Delivery August 2007
 Implementation August 2009

- Barrage de la Tuillières weir system (Dordogne, France)
 4 sluice drives 195kN/1000mm
 Delivery October 2007
 Implementation June 2008

- Altenrheine lockage (Dortmund-Ems Canal / North Rhine Westphalia)
 Lower head
 2 abutment beam drives 110kN/2100mm
 Delivery October 2007
 Implementation January 2008

- Upper lock Minden lockage (connection channel from south, Minden - Lower Saxony)
 Flap gate drive UH 150kN/6300mm
 Delivery February 2008
 Implementation August 2008

- Baldeneysee lockage (Ruhr, North Rhine Westphalia)
 2 lift gate drives UH 185kN/4500mm
 Delivery January 2008
 Implementation November 2008

- Barrage de la Tuilières weir system (Dordogne, France)
 1 sluice drive 276kN/1750mm
 Delivery April 2008
 Implementation June 2009

- Bischofwerder lockage (Voss Canal, Brandenburg)
 Head gate / aft gate
 4 mitred gate drives 110kN/2000mm
 4 sluice drives 20kN/850mm
 Delivery December 2007
 Implementation April 2008

- Brienen lockage (Spoy Canal, North Rhine Westphalia)
 2 sluice drives 50kN/2100mm
 Delivery February 2008
 Implementation May 2008

- Landing stages of St.Pauli (Elbe, Hamburg)
 8 flood-control gate drives 150kN/2100mm
 8 locking cylinders 4kN/180mm
 Delivery December 2007
 Implementation August 2009

- Eldena lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 Aft gate / head gate
 4 mitred gate drives UH/LH 30kN/37kN/1530mm
 4 sluice gate drives UH/LH 28kN/950mm
 Delivery February 2008
 Implementation April 2008

- Klingenberg dam (Wilde Weißeritz, Saxony)
 2 sluice drives 150kN/2100mm
 Delivery December 2007
 Implementation November 2008

- Spandau Citadel weir (Havel, Berlin)
 1 drive, fishbellied flap 160kN/2500mm
 Delivery January 2008
 Implementation June 2008

- Spitalberg Flood control reservoirs, Offenburg (Baden-Wuerttemberg)
 2 drives, fishbellied flaps 80kN/930mm
 Delivery January 2008
 Implementation June 2008

- Lockage of Evergem 2nd Sluis (Ringvaart Noord, Belgien)
 37 sluice drives 150kN/1600mm
 Delivery December 2008
 Implementation June 2009

- Bevergern lockage (Dortmund-Ems Canal / North Rhine Westphalia)
 Aft gate / head gate
 2 mitred gate drives LH 160kN/3000mm
 4 circulation sluice drives LH/UH 134kN/600mm
 1 flap gate drive UH 104kN/6500mm
 Delivery July 2009
 Implementation November 2009

- Venhaus lockage (Dortmund-Ems canal, North Rhine Westphalia)
 Aft gate / head gate
 2 mitred gate drives LH 160kN/3000mm
 4 circulation sluice drives LH/UH 134kN/600mm
 1 flap gate drive UH 104kN/6500mm
 Delivery July 2009
 Implementation November 2009

- Rodde lockage (Dortmund-Ems canal, North Rhine Westphalia)
 Aft gate / head gate
 2 mitred gate drives LH 160kN/3000mm
 4 circulation sluice drives LH/UH 134kN/600mm
 1 flap gate drive UH 104kN/6500mm
 Delivery July 2009
 Implementation November 2009

- Hesselte lockage (Dortmund-Ems Canal, North Rhine Westphalia)
 Aft gate / head gate
 2 mitred gate drives LH 160kN/3000mm
 4 circulation sluice drives LH/UH 134kN/600mm
 1 flap gate drive UH 104kN/6500mm
 Delivery July 2009
 Implementation November 2009

- Gleesen lockage (Dortmund-Ems Canal, North Rhine Westphalia)
 Aft gate / head gate
 2 mitred gate drives LH 160kN/3000mm
 4 circulation sluice drives LH/UH 134kN/600mm
 1 flap gate drive UH 104kN/6500mm
 Delivery July 2009
 Implementation November 2009

- Chautagne lockage (Haut-Rhône, France)
 5 mitred gate drives 218kN/3300mm
 Delivery December 2008
 Implementation 2011

- Belley lockage (Haut-Rhône, France)
 4 mitred gate drives 218kN/3300mm
 Delivery July 2009
 Implementation 2011

- Geiseltalsee weir system (Lake Geiseltal, Saxony-Anhalt)
 1 drive, fishbellied flap 340kN/3200mm
 Delivery 2009
 Implementation September 2009

- Brandshof dyke (Lower Bille, Hamburg)
 1 sluice drive - sluice 110kN/2800mm
 1 sluice drive - Bille 110kN/2200mm
 1 Schützantrieb - HWS110kN/4000mm
 Delivery February 2009
 Implementation November 2009

- Brieskow-Finkenheerd dyke (Oder, Brandenburg)
 2 mitred gate drives 130kN/2000mm
 Delivery 2009
 Implementation October 2009

- Duisburg-Meiderich lockage (Rhine–Herne Canal, North Rhine-Westphalia)
 4 sluice drives LH/UH 200kN/3300mm
 Delivery September 2008
 Implementation April 2010

- New Niederfinow ship lift (Oder-Havel-Canal, Brandenburg)
 10 swivelling segment gate drives 650kN/2670mm
 8 swivelling segment locking drives 10kN/450mm
 18 pressure frame drives 140kN/300mm
 Delivery starting 2014

- Guttenbach lockage (Neckar, Baden-Wuerttemberg)
 Right chamber of upper head / lower head
 4 mitred gate drives 300kN/1800mm
 4 segment gate drives 140kN/420mm
 Delivery November 2010
 Implementation 2011

- Anderten lockage (Mittelland Canal - Lower Saxony)
 5 sluice drives LH/UH 200kN/2900mm
 Delivery December 2009
 Implementation April 2010

- Wehranlage Neustadt-Glewe (Müritz-Elde-Waterway, Mecklenburg-Western Pomerania)
 2 drives, fishbellied flaps 203kN/4500mm
 Delivery August 2009
 Implementation September 2009

- Lauenburg weir system (Elbe-LübeckCanal, Schleswig-Holstein)
 1 drives, fishbellied flaps 425kN/4200mm
 Delivery September 2009
 Implementation May 2010

- Lindenau weir system (Pulsnitz, Brandenburg)
 1 drives, fishbellied flaps 390kN/3000mm
 Delivery September 2009
 Implementation September 2009

- Fürstenberg lockage (Havel Waterway, Brandenburg)
 LH/UH
 4 mitred gate drives 30kN/1530mm
 4 sluice gate drives 20kN/800mm
 Delivery February 2010
 Implementation May 2010

- Lockage lock link canal 6 (Neuwieser-/Partwitzer See, Saxony)
 LH/UH
 2 mitred gate drives 30kN/1530mm
 2 sluice gate drives 20kN/850mm
 Delivery December 2010

- Garde de Deluz lockage (Canal du Rhone au Rhin, France)
 UH/LH
 4 mitred gate drives 20kN/1200mm
 Delivery June 2010
 Implementation 2011

- Lewitz lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 LH/UH
 4 mitred gate drives UH/LH 53kN/1530mm
 4 sluice gate drives UH/LH 31kN/950mm
 Delivery February 2010
 Implementation May 2010

- Güritz weir system (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 2 drives, fishbellied flaps 465kN/5300mm
 Delivery March 2011
 Implementation 2014

- Malchow weir system (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 2 drives, fishbellied flaps 425kN/4200mm
 Delivery March 2011
 Implementation 2014

- City of Halle lockage (Saale, Saxony-Anhalt)
 4 mitred gate drives UH/LH 24kN/1530mm
 2 sluice gate drives LH 35kN/1250mm
 Delivery May 2010
 Implementation May 2010

- Rischmühle lockage (Saale, Saxony-Anhalt)
 4 mitred gate drives LH/UH 24kN/1530mm
 4 circulation sluice drives LH/UH 35kN/1250mm
 Delivery May 2010
 Implementation May 2010

- Lockage Connewitz weir (Junction canal Leipzig-Cosputener See, Saxony)
 2 cheek gate drives LH/UH 30kN/1850mm
 Delivery June 2010

- Koblenz 2 lockage (Mosel, Rhineland-Palatinate)
 2 segment gate drives 140kN/420mm
 Delivery November 2010
 Implementation 2011

- Bolzum lockage (Hildesheim branch canal - Lower Saxony)
 3 mitred gate drives (LH) 512kN/2150mm
 3 swivelling segment gate drives (UH) 918kN/2150mm
 3 circulation sluice drives 370kN/2000mm
 Delivery 2011
 Implementation October 2012

- Bobzin lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 2 mitred gate drives LH 30kN/2450mm
 4 sluice drives LH/UH 75kN/1530mm
 1 flap gate drive UH120kN/2600mm
 Delivery March 2011
 Implementation May 2011

- Filling HWS Bayreuth (Bayreuth, Bavaria)
 1 sluice drive 110kN/1050mm
 1 locking drive 40kN/130mm
 Delivery March 2011
 Implementation 2012

- Artern lockage (Unstrut, Thuringia)
 Head gate / aft gate
 4 slide gate drives 20kN/830mm
 Delivery March 2011
 Implementation May 2011

- Hoftal flood control reservoirs (Bottwar, Baden-Württemberg)
 4 sluice drives (operating outlet) 70kN/1550mm
 2 sluice drives (bottom outlet) 70kN/3150mm
 2 drive, fishbellied flap 75kN/1900mm
 Delivery 2011
 Implementation 2012

- Planena lockage (Saale, Saxony-Anhalt)
 4 mitred gate drives UH/LH  24kN/1530mm
 2 sluice gate drives LH 35kN/1250mm
 Delivery May 2011
 Implementation 2011

- Gimritz lockage (Saale, Saxony-Anhalt)
 4 mitred gate drives UH/LH 24kN/1530mm
 2 sluice gate drives LH 35kN/1250mm
 Delivery May 2011
 Implementation 2011

- Dörverden lockage (Mittelweser, Lower Saxony)
 3 mitred gate drives (AG) 280kN/2650mm
 3 swivelling segment gate drives (HG) 1500kN/2900mm
 1 locking drive (HG) 20kN/250mm
 2 circulation sluice drives 320kN/2650mm
 2 abutment beam drives 210kN/850mm
 2 abutment beam locking drives 30kN/300mm
 Delivery starting November 2012
 Implementation 2013

- Canoe Park lock in Markkleeberg (Markkleeberg lake, Saxony)
 2 mitred gate drives LH 15kN/1800mm
 1 cheek gate drive UH 30kN/1800mm
 2 sluice gate drives LH 25kN/880mm
 Delivery 2011

- Weir system 14 Schmogrow (Langer Fließ, Brandenburg)
 1 drive, fishbellied flap 250kN/2500mm
 Delivery August 2011
 Implementation 2011

- Kersdorf lockage (Oder-Spree Canal, Brandenburg)
 2 mitred gate drives (AG) 130kN/2000mm
 1 swivelling segment gate drives (HG) 1600kN/2100mm
 1 locking drive (HG) 10kN/ 280mm
 4 sluice gate drives AG 80kN/1150mm
 2 abutment beam drives 100kN/2900mm
 4 abutment beam locking drives 10kN/ 280mm
 Delivery End of 2011 (UH) / December 2012 (LH)
 Implementation 2013

- Talange Lockage (Canal de la Moselle, France)
 5 mitred gate drives UH/LH 59kN/1230mm
 5 circulation sluice drives LH 70kN/1030mm
 Delivery August 2011
 Implementation January 2012

- Kleinmachnow weir system (Teltow Canal, Berlin)
 1 slide gate drive 50kN/2550mm
 Delivery December 2011
 Implementation February 2012

- Düthe lockage (Dortmund-Ems Canal / North Rhine-Westphalia)
 4 sluice drives 137kN/730mm
 4 abutment beam locking cylinders 8kN/190mm
 Delivery January 2012
 Implementation 2012

- Hilter lockage (Dortmund-Ems Canal / North Rhine-Westphalia)
 4 sluice drives 137kN/730mm
 4 abutment beam locking cylinders 8kN/190mm
 Delivery January 2012
 Implementation 2013

- Hüntel lockage (Dortmund-Ems Canal / North Rhine-Westphalia)
 4 cylindrical sluice drives 137kN/ 730mm
 4 mitred gate drives 302kN/2900mm
 4 abutment beam locking cylinders 8kN/ 190mm
 Delivery 2013
 Implementation 2013

- Wusterwitz lockage (Elbe-Havel Canal / Brandenburg)
 4 circulation sluice drives 410kN/3300mm
 4 mitred gate drives  575kN/1950mm
 Delivery August 2012

- Lockage Minden Weser lock (Weser, Lower Saxony)
 2 mitred gate drives (AG) 300kN/2800mm
 1 swivelling segment gate drive (HG) 1150kN/2900mm
 1 locking drive (HG) 11kN/ 300mm
 4 circulation sluice drives 380kN/2200mm
 6 saving basin lock drives 380kN/2200mm
 Delivery 2014

- Richemont Lockage (Canal de la Moselle, France)
 4 mitred gate drives UH/LH 59kN/1230mm
 4 circulation sluice drives LH 70kN/1030mm
 Delivery May 2012
 Implementation 2012

- Riensluis Lemmer lockage (Spuilock, Holland)
 4 mitred gate drives 60kN/2050mm
 4 sluice drives 5kN/ 730mm
 1 locking drive 15kN/ 430mm
 Delivery July 2012
 Implementation 2012

- Lockage lock link canal 12 (Senftenberger-/Geierswalder See, Saxony)
 LH/UH
 2 mitred gate drives 30kN/1530mm
 2 sluice gate drives 20kN/850mm
 Delivery November 2012

- Geesthacht lockage (Elbe, Schleswig-Holstein)
 UH flap valve
 2 locking drives 80kN/900mm
 Delivery November 2012
 Implementation 2014

- Hechtsforth lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 2 mitred gate drives LH 30kN/1530mm
 2 sluice drives LH 32kN/980mm
 2 sluice drives UH 32kN/1250mm
 1 flap gate drive UH 133kN/2600mm
 Delivery March 2013
 Implementation 2013

- Lockage 2nd Julianasluis (Hollandse IJssel, Holland)
 12 sluice drives 50kN/1530mm
 Delivery 2013
 Implementation 2014

- Beeskow lockage (Spree, Brandenburg)
 LH/UH
 4 mitred gate drives 30kN/1530mm
 4 sluice drives 25kN/980mm
 Delivery 2013
 Implementation 2013

- Goejanverwellesluis lockage (Hollandse IJssel, Holland)
 2 sluice drives 12kN/2200mm
 1 sluice drive 5kN/ 930mm
 Delivery May 2013

- Ryburg-Schwörstadt Fish pass (Rhine, Switzerland)
 1 swing gate drive 200kN/2200mm
 Delivery June 2013
 Implementation 2014

- Metz Lockage (Canal de la Moselle, France)
 5 mitred gate drives UH/LH 59kN/1230mm
 5 circulation sluice drives LH 70kN/1030mm
 Delivery May 2013
 Implementation 2014

- Comblain_au_Pont weir system (Belgium)
 1 flap drive 25kN/1630mm
 Delivery June 2013
 Implementation 2014

- Wüstenhausen flood control reservoirs (Ilsfeld, Baden-Wuerttemberg)
 1 flap drive 75kN/1580mm
 Delivery June 2013
 Implementation 2014

- Obertürkheim lockage (Neckar, Baden-Wuerttemberg)
 Right chamber of upper head / lower head
 4 mitred gate drives 450kN/1800mm
 4 segment gate drives 140kN/420mm
 Delivery April 2014

- Wolfsbruch lockage (Hüttenkanal, Brandenburg)
 Head gate / aft gate
 4 mitred gate drives 30kN/1530mm
 4 roll wedge drives 25kN/850mm
 Delivery January 2014
 Implementation 2014

- Poelsluis lockage (Zaan - Wormer polder, Holland)
 2 sluice drives 3kN/630mm
 Delivery November 2013
 Implementation 2014

- Henne Reservoir weir system (Ruhr, North Rhine Westphalia)
 1 flap drive 140kN/2900mm
 Delivery February 2014
 Implementation 2014

- Findenwirunshier lockage (Müritz-Elde waterway, Mecklenburg-Western Pomerania)
 LH/UH
 4 mitred gate drives UH/LH 53kN/1530mm
 4 sluice gate drives UH/LH 32kN/950mm
 Delivery February 2014
 Implementation 2014

- Petershagen lockage (Weser sluice channel, North Rhine Westphalia)
 5 mitred gate drives 280kN/2700mm
 Delivery May 2014
 Implementation 2014

- Hessigheim lockage (Neckar, Baden-Wuerttemberg)
 Right chamber of upper head / lower head
 6 mitred gate drives 450kN/1800mm
 6 segment gate drives 140kN/420mm
 Delivery May 2014

- Lockage lock link canal 1 (Spreetaler-/Sabrodter See, Saxony)
 LH/UH
 2 mitred gate drives 40kN/1530mm
 2 sluice gate drives 30kN/ 980mm
 Delivery March 2014

- Voßwinkel lockage (Upper Havel Waterway, Mecklenburg-Western Pomerania)
 Head gate / aft gate
 4 mitred gate drives 30kN/1530mm
 4 sluice drives 20kN/850mm
 Delivery February 2015
 Implementation 2015

- Zerpenschleuse lockage (Langer Trödel, Brandenburg)
 Head gate / aft gate
 4 mitred gate drives 58kN/1530mm
 4 sluice drives 31kN/850mm
 Delivery November 2014

- Lower and upper weir of Zerben (Elbe-Havel Canal / Brandenburg)
 2 drives, fishbellied flaps 300kN/2400mm
 Delivery August 2014
 Implementation 2015

- Barrage des Lorraines weir system (Rivière Allier / France)
 2 drives, fishbellied flaps 700kN/3500mm
 Delivery October 2014
 Implementation 2015

- Lower lock Berlin weir system (Landwehr Canal, Berlin)
 Drive, fishbellied flap 75kN/1900mm
 Delivery March 2015
 Implementation 2015

- Tussensluis lockage (Hoge Vaart Almere, Holland)
 4 mitred gate drives 41kN/1900mm
 4 sluice drives 4kN/ 630mm
 Delivery February 2015
 Implementation 2015

- Beatrixsluis lockage (Almere, Holland)
 4 mitred gate drives 17kN/1080mm
 4 sluice drives 4kN/ 630mm
 Delivery February 2015
 Implementation 2015

- New Niederfinow ship lift (Oder-Havel-Canal, Brandenburg)
 8 drives trough holding device 50kN/1030mm
 Delivery 2016

- Barrage du Joux weir system (La Turdine / France)
 1 segment flap drive 150kN/1250mm
 Delivery April 2015
 Implementation 2015

- Emspier dolphin berth (Emden / Lower Saxony)
 2 Ro-Ro berth drives 700kN/7740mm
 Delivery November 2015
 Implementation December 2015

- Miedema Gemaal lockage (Holland)
 1 sluice drive 20kN/ 980mm
 Delivery July 2015

- Neckar lockages (Neckar, Baden-Wuerttemberg)
 Upper head/lower head
 18 mitred gate drives 450kN/1800mm
 16 segment gate drives 160kN/420mm
 Delivery starting February 2016

- Oudewater lockage (Holland)
 2 gate drives 10kN/ 800mm
 2 gate drives 9kN/1150mm
 2 sluice drives 6kN/ 630mm
 Delivery December 2015

- Ameland lockage (Holland)
 2 sluice drives 30kN/1630mm
 Implementation January 2016

- Rosenbeck weir system (Werbellin canal, Brandenburg)
 1 sluice drive 20kN/850mm
 Delivery November 2015

- Fürstenberg weir system (Havel Waterway, Brandenburg)
 2 drives, fishbellied flaps 270kN/2500mm
 Delivery February 2016

- Saldernhorst weir system (Dosse, Brandenburg)
 2 drives, fishbellied flaps 400kN/4000mm
 Delivery February 2016

Top of page
 

We will gladly submit you a non-binding offer. Simply send us your technical data, the description of your operation
case or your tender. Or conveniently use our online questionnaire.


Telephone:
+49 781 209-0

Fax:
+49 781 209-99
You can download our technical questionnaire "Hydraulic steel works" HERE 

E-Mail:
Anfrage@ade.de
You can download our technical questionnaire "Hydraulic steel works" HERE 


Of course, we also gladly accept your requests by postal mail.